The Devon Coal research facility in Devon, AB required additional access and crane control stations at crane level in several locations in the facility. We worked to conceptualize and detail and assist the contractor in installing lightweight aluminum control stations with new ladder and platform access. The details needed precision in order to have all the moving parts align correctly. The final product, manufactured and installed by EdLam construction was so well tuned that these 1000 lb cages could be pushed effortlessly with one hand.
Devon Coal Research – Gantry Cranes
Client:
Alberta Infrastructure
Contractor:
EdLam Construction
Engineering:
Structural, LifeCycle Design
Cost:
$132,500
Span:
Design start to construction completion, Jan 2017 to Dec 2017