This project was the reconstruction of the reflecting pool at the Royal Alberta Museum/ Government House grounds. To bring the reflecting pool up to current standards a complete chlorination system heeded to be added. We placed a “folly” in the forested area of the park as the pump house, echoing the circular motif of the original fountain and sculpture. The pool was completely reconstructed with matching vintage style tiles, new walkways sympathetic to the original, and with a completely new functioning mechanical system.
R A M Fountain Upgrade
Client:
Alberta Infrastructure
Contractor:
Formula Construction
Engineering:
Mechanical Elliot Abrams Engineering Ltd, Electrical – ReLumen Engineering,
Cost:
$1.1 M
Span:
Design begun Feb 2014. Construction complete Oct 2014