The existing 14 floor TELUS Toll building in downtown Edmonton had reached a critical point wherein the cooling requirements for telecommunications operations was soon to be insufficient for the loads. We were part of a specially selected team that provided design through to CA services for a new two level mechanical penthouse and a two story screen for the Chillers on top of the existing building. This project encapsulated a previous two level Generator building we had completed years before, clad with blue panels with a wave motif.
TELUS – Edmonton Toll New Chiller Plant
Client:
TELUS
Contractor:
Delnor Construction
Engineering:
Structural- RJC Consulting Engineers, Mechanical – HRC Engineering Ltd., Electrical – WSP Engineering
Cost:
Complete cost +/- $18M, Architectural components +/- $3.5M
Span:
Design begun Jan 2017. Construction complete Oct 2020